A93 carriageway patching works between Binzean and Slochnacraig

blog-img

25 May for 10 days.

Patching works between Binzean and Slochnacraig will be carried out at the same as the resurfacing works of A93 carriageway resurfacing between Broughbearg and the Hut, (25 May 2025 for 10 nights with road closure between 8pm to 8am) in preparation for surface dressing over this section.

Articles/Stories

BaRI Tasters

Business News/Updates

Latest News

Scottish Recipes

Traffic/Roads

A93 carriageway patching works between Binzean and Slochnacraig


25 May for 10 days.

Patching works between Binzean and Slochnacraig will be carried out at the same as the resurfacing works of A93 carriageway resurfacing between Broughbearg and the Hut, (25 May 2025 for 10 nights with road closure between 8pm to 8am) in preparation for surface dressing over this section.


Previous Page

Access key details

1 Home page
2 What's new
4 Search
9 Feedback form
0 Access key details